Buy me a coffee

← Tools

ITAM maturity assessment: Halden Logistics (baseline, 2026-09-24)

Download Word (.docx) Download Excel (.xlsx)

Main caveat: Maturity answers (example data) gives only a score for each area. There is no evidence column, so every score below is self-reported and Unverified:. To test the scores, I checked them against the demo estate files (apps.csv, licenses.csv, accounts.csv, employees.csv). I only lowered a score when that data contradicted the question the area actually asks.

Score table

Score table
AreaStatedAssessedCrosswalk (ISO/IEC 19770-1 · COBIT 2019 · ISO 27001)Reasoning
governance33 Unverified:XW-003 (4.3, 5.2 · APO01 · A.5.1), XW-004 (5.3 · APO01 · A.5.2)No policy was supplied. Council draft has a scope but no decision rights, quorum or sponsor, which fits 3 at best.
inventory33 Unverified:XW-001, XW-005 (8.3 · BAI09.01 · A.5.9)60 apps are recorded with every field filled in. No discovery or reconcile date is given.
entitlement11XW-006/007/008 (8.4 · BAI09.05 · A.5.32)The data supports this score. Two licenses have expired but the apps are still in use (details below). For 41 of 60 apps, recorded users exceed entitlements.
lifecycle22XW-009 (19770-1 Annex A · BAI09.03 · A.5.9), XW-010 (19770-1 Annex A Retirement · BAI09.03 · A.8.10).The data doesn't contradict this. Apps keep running after their licenses lapse, and there's no retirement trail.
vendor44 Unverified:XW-013 (8.7 · APO10 · A.5.19, A.5.20)Renewal dates are on file. No vendor risk ratings are supplied, so I can't confirm the "Measured" level.
data-quality11XW-026 (8.3 · BAI09.01 · A.5.9)The data supports this score. Account ACC-104 belongs to EMP-099, who isn't in the employee records. Five categories each have two overlapping products that nobody has reconciled.
security33 Unverified:XW-014 (DSS05.04 · A.5.15)Held at 3, with a serious related finding (see below).
cost44 Unverified:XW-012 (APO06)No budget-versus-actual data was supplied.
reporting33 Unverified:XW-025 (9.1–9.3, 10.3 · MEA01 · 9.1, 10.1)No metrics pack or review action was supplied.

Findings that affect scoring

The three gaps

  1. entitlement (1). This has the most direct financial and audit exposure. Two lapsed licenses cover $133,000 of annual spend, and the license position on most of the estate is unknown. That creates risk from vendor audits and true-up bills.
  2. data-quality (1). It ties with entitlement on score. I broke the tie by business risk and put it second: its harm is indirect, but it undermines every other area. You can't fix the license position or retire apps reliably when records have unknown owners and unreconciled duplicates.
  3. lifecycle (2). This is the only area at 2, so no tie-break was needed for third place. Apps running past their licenses show that nothing currently decides whether an app gets renewed or retired.

90-day plan

Decision needed: the sponsor must confirm the owner roles and approve a budget for each gap. The roles below are proposals, and I haven't estimated costs.

90-day plan
GapProposed owner roleActions (days 0–90)Evidence of progress
entitlementSoftware asset / license manager1. Resolve LIC-017 and LIC-044 within 30 days (renew or shut down). 2. Build a compliance position for the top 10 apps by cost, comparing entitlements to actual installs and seats (XW-007). 3. Set up renewal alerts 90 days before every expiry (XW-008).A dated compliance position for the top 10 apps, no expired licenses on live apps, and a renewal calendar.
data-qualityITAM manager (with the HR data owner)1. Set the required fields and a monthly 10-record sample check. 2. Reconcile all accounts against the HR employee records. Fix or remove ACC-104 and any other account with no matching employee. 3. Review the 5 overlapping category pairs and record a keep/merge decision for each.Sample accuracy rising month on month, zero accounts without a matching employee, and a decision log for the 5 pairs.
lifecycleApplication portfolio owner1. Document the path from request to approval, renewal and retirement (XW-009). 2. Add a decommissioning checklist covering data removal and access removal (XW-010). 3. Run one real retirement through it, for example a loser from the overlap review.An approved process document and one retirement with its full audit trail.

Decision needed: before next year's re-check, should process owners be required to supply one piece of evidence per area? Without it, the next assessment will also rest on self-reported scores.

``findings [ {"type": "maturity_gap", "id": "entitlement"}, {"type": "maturity_gap", "id": "data-quality"}, {"type": "maturity_gap", "id": "lifecycle"} ] ``