Buy me a coffee

← SAM toolkit

SAM toolkit guide

Download Word (.docx)

What you tick or type stays in this browser. The Word and Excel downloads are blank copies. To keep your answers, use Download my answers (Word), or print this page or save it as PDF.

Eight working files to support a software and IT asset management (SAM/ITAM) practice. They are blank templates and checklists. Open the CSV files in Excel, Google Sheets, or any spreadsheet; they are plain text, so nothing is locked. All data in the examples is fictional (the Halden Logistics demo estate).

The files follow ISO/IEC 19770-1:2017. Clause numbers are given so you can trace each file back to the standard. The text is paraphrased and does not replace the standard. No affiliation with or endorsement by ISO or IEC.

Where to start

  1. Tier self-assessment: find out which tier you are at.
  2. Statement of applicability template: decide which processes are in scope.
  3. Asset record template and License position template: get the data right first (tier 1).
  4. Renewal calendar template, Authorization log template, Vendor contract register template: add the records that keep it right.
  5. Internal audit and management review checklist: check the system on a schedule.

The files

license-position.csv (clause 8.4)

One row per product. Reconcile what you own against what is in use.

A user count is not always the licensed quantity. Confirm the vendor's metric before acting on a shortfall. See License position example.

renewal-calendar.csv (clause 8.4, crosswalk XW-008)

One row per license or contract.

asset-record.csv (clause 8.3, 7.6.2)

The core data record. One row per asset (software, hardware, or an IT service).

The standard requires accurate data for every core asset through its life and a record of whether each asset is authorized.

authorization-log.csv (clause 7.6.3)

Record who made each authorization, when, and why. Record who carried it out, when, and against which authorization.

statement-of-applicability.csv (clause 6.2.2)

Pre-filled with the 15 processes in Annex A. For each, say whether it is in scope and why. The standard asks for a justification for every inclusion and exclusion.

vendor-contract-register.csv (clause 8.7, crosswalk XW-013)

One row per supplier contract that affects ITAM.

Tier self-assessment (Annex A and B)

A yes/partly/no check across three tiers, with a place for evidence.

Internal audit and management review checklist (clauses 9.2, 9.3, 10.1)

A plan-and-record checklist for the internal audit, and a pack list for the management review.

Limits

These are templates, not a platform. They do not discover installs, read vendor license terms, or tell you what a license permits. Verify license terms against the contract. A governance decision still needs a person to make it.